Maguire BrothersCase Study
The Sacred Heart Parish Hall in Wimbledon

Sacred Heart Parish HallOver 20cm of water was lying on the roof of this 1960's building when we surveyed it. This was a Design And Build Contract and our terms of reference were to replace the roof decking and coverings with a system for which we could provide an insurance backed twenty year Guarantee.There are actually seven separate roofs, but the main area is a single span of over eight hundred square metres.

The massive temporary roof was itself a fine piece of Engineering. The steel roof decking was topped with a polyurethane insulation system, manufactured to provide adequate falls. Finally, state of the art membranes were laid to complete a durable weatherproofing system, which will last long into the next millennium.

 

Return To Case Studies